ORC Week 5: When One Room Becomes Three and a Half
Everything was going really well. We were on track, even ahead! That is, I thought we were ahead until I realized that I don't have one room to finish by next week; I have three and a half. Our kitchen is situated in between two other rooms and a hallway, and there is no way to show off all the work we've done without revealing those other very unfinished spaces. Eek!
I took some time Tuesday and Wednesday to begin priming those spaces where we had done some drywall work previously. On Wednesday, I managed to paint the walls and ceiling of the kitchen.
Our punch list now looks something like this:
I took some time Tuesday and Wednesday to begin priming those spaces where we had done some drywall work previously. On Wednesday, I managed to paint the walls and ceiling of the kitchen.
Our punch list now looks something like this:
- Make, install, caulk, and paint baseboards
- Caulk and paint door casings and cabinet trim
- Cut, sand, stain, seal, and install shelves and window sill
- Install three light fixtures
- Cut and install toekicks and final two cover panels
- Paint the adjoining study and hang art over piano (because that will be one of the main perspectives in the room reveal)
- Paint the adjoining living room (which happens to have high ceilings which are a PAIN to paint)
- Prime and paint back door, closet, bath, and utility room doors. Replace door knobs.
- Install cabinet pulls
- Install hanging rod for pans
- Buy new pans (help me choose! I know I want pretty, dishwasher safe, not teflon because that's why we're replacing the old ones)
- Style and take pictures
Y'all, we have like six days. I'm going to go ahead and make this a short post and get back to work.
Go check out the other participants!!!
Thanks for following along!
-Kelli